Feedback

Dismantling of last fortification takes place in Stanytsia Luhanska

The Ukrainian side is ready to begin the works on the restoration of the bridge
13:11, 2 September 2019

censor.net.ua

The dismantling of the last fortification takes place near the destroyed bridge in Stanytsia Luhanska as the HQ of the Joint Forces Operation reported on Facebook.

The Ukrainian side is ready to begin the works on the restoration of the bridge. According to the Joint Center for Control and Coordination, the militants do not hold the dismantling of their fortifications.

“As of 9 a.m., the armed formations of the Russian Federation and their mercenaries do not hold the engineering works on the dismantling; conversely, the strengthening of the temporary structure of blue color with a sign Joint Center for Control and Coordination takes place,” the message said.

Related: Bridge in Stanytsia Luhanska is planned to be restored by the end of autumn, - Olifer

The Ukrainian military strengthens their positions and equip the team sites at the contact lime to “provide an adequate response to the militants” in case of the escalation.

Earlier we reported that the illegal armed formations of occupied Donbas continue to simulate works on the dismantlement of the fortifications situated in Stanytsia Luhanska.

As we reported, Ukrainian demolition experts finished the mine-clearing works in the area of Stanytsia Luhanska checkpoint

Related video:

Topics:
Система Orphus

If you find an error, highlight the desired text and press Ctrl + Enter, to tell about it

Comments
see more